PAKT - Stipulations for Mechanical Equipment
Below you will find the ruling and specifications which are valid for mechanical work at the Swedish nuclear power plants. OKG furthermore has some special supplements to certain documents which are indicated below.
PAKT-definitions
Addendum for the documents ABM, KBM, TBM and TBV - Technical Notice
Quality regulations for mechanical equipment (edition 8)
Technical regulations for surface treatment
Approved Paint Systems for TBY
Appendix TBY
Appendix 1
Appendix 2
Appendix 3
Appendix 4
Forms TBY
D.100 - Report for anti-corrosion painting
D.101 - Report for anti-corrosion painting 2
D.102 - Report for paint inspection building, concrete painting
D.103 - Report for paint inspection building, steel painting
D.104 - Non conformity report
D.105 - Report for hot galvanizing
D.106 - Evaluation of corrosion protection according to suppliers standard procedure
D.107 - Report for performed inspection by anti-corrosive painting to supplier's standard program
D.108 - Report for rubber coating
D.109 - Inspection plan painting-rubber coating
D.110 - Report for humidity measurement
D.111 - Inspection of concrete surface before painting
D.112 - Report for porosity inspection of coating
D.113 - Report from adhesion and surface strength value determination to concrete surface
D.115 - Analysis report for rinsing water
D.116 - Product sheet for paint manufacturing
D.117 - Quality control of paint manufacturing
D.118 - Inspection plan for floor surfacing